Rough Water, Heavy Loads: Operational Envelope Analysis for T-ATS Navajo-Class FADOSS Lifting Systems
Holding Fast: Heavy Weather Mooring Engineering for 540-ft Training Vessel

PCCI provided detailed heavy weather mooring engineering services for the Training Ship Golden Bear
Flat Deck to Dive Platform: Dive Barge Conversion for Navy’s Premier Aircraft Carrier

Transforming a flat deck barge into a fully mission-capable dive platform for one of the Navy’s most visible aircraft carriers.
Beyond the Training Event: Sustained Emergency Preparedness for Mining Operations Across the Americas

For more than two decades, PCCI has served as the embedded emergency management partner for one of the world’s largest global mining corporations
Building Resilience Across Industries: Crisis Management, Emergency Preparedness, and Business Continuity

When high-consequence incidents occur — whether an explosion at a refinery
From Shore to Seafloor: Deepwater Mooring and Subsea Cable Installation

San Clemente Island, California
Fueling the Fleet: SPM Buoy Overhaul and Repair in Okinawa

PCCI has provided maintenance, emergency repair, and full overhaul services for the U.S.
Remote Pacific 4-Point Mooring Installation

Executing a complete mooring system overhaul at one of the most remote and logistically challenging locations in the Pacific — during a global pandemic.