Project Overview
Essential infrastructure protecting national defense assets. PCCI was selected to deliver a complete refurbishment, managing every phase from design through final installation.
The Challenge
The existing barrier system needed modernization: 28 Port Security Barrier (PSB-T) modules required refurbishment, mooring infrastructure demanded upgrades, and damaged riser chains posed safety and security risks.
Our Solution
PCCI orchestrated a complex, multi-phase operation:
Beyond execution, PCCI provided comprehensive project management, engineering design, material procurement, fabrication, and logistics—plus detailed planning for safety, environmental protection, and schedule management. PCCI delivered a fully modernized water security barrier system, on schedule and per U.S. Navy specifications.
Services
Executing a complete mooring system overhaul at one of the most remote and logistically challenging locations in the Pacific —
PCCI has provided maintenance, emergency repair, and full overhaul services for the U.S.
San Clemente Island, California
PCCI was engaged by the LENOWISCO Planning District Commission
Concept design and stability analysis for a next-generation service operations vessel supporting offshore renewable energy installations.Concept design and stability analysis for a next-generation service operations vessel supporting offshore renewable energy installations.