Rough Water, Heavy Loads: Operational Envelope Analysis for T-ATS Navajo-Class FADOSS Lifting Systems
Modernizing Essential Security Barriers at a Strategic Naval Port

Naval Station Mayport, one of the Navy’s most critical strategic ports, required a comprehensive overhaul of its Passive Water Barrier system
Subsea Sensors & Cable Systems: Navy Magnetometer Array Installation and Repair

The U.S. Navy relies on precisely installed arrays of subsea magnetometers to detect and measure the magnetic signatures of vessels passing through critical waterways.
Powering the Platform: Submarine Power and Fiber Optic Cable Replacement at Seneca Lake

PCCI delivered the Seneca Lake Submarine Power and Fiber Optic Cable Replacement as the prime contractor for a complex design-build marine infrastructure project in upstate New York.
Holding Fast: Heavy Weather Mooring Engineering for 540-ft Training Vessel

PCCI provided detailed heavy weather mooring engineering services for the Training Ship Golden Bear
Flat Deck to Dive Platform: Dive Barge Conversion for Navy’s Premier Aircraft Carrier

Transforming a flat deck barge into a fully mission-capable dive platform for one of the Navy’s most visible aircraft carriers.
Beyond the Training Event: Sustained Emergency Preparedness for Mining Operations Across the Americas

For more than two decades, PCCI has served as the embedded emergency management partner for one of the world’s largest global mining corporations
Building Resilience Across Industries: Crisis Management, Emergency Preparedness, and Business Continuity

When high-consequence incidents occur — whether an explosion at a refinery
From Shore to Seafloor: Deepwater Mooring and Subsea Cable Installation

San Clemente Island, California
Fueling the Fleet: SPM Buoy Overhaul and Repair in Okinawa

PCCI has provided maintenance, emergency repair, and full overhaul services for the U.S.