Rough Water, Heavy Loads: Operational Envelope Analysis for T-ATS Navajo-Class FADOSS Lifting Systems
Powering the Platform: Submarine Power and Fiber Optic Cable Replacement at Seneca Lake

PCCI delivered the Seneca Lake Submarine Power and Fiber Optic Cable Replacement as the prime contractor for a complex design-build marine infrastructure project in upstate New York.
McMurdo Station Pier Design

Improving Polar Resupply Operations Through Engineering Innovation
Holding Fast: Heavy Weather Mooring Engineering for 540-ft Training Vessel

PCCI provided detailed heavy weather mooring engineering services for the Training Ship Golden Bear
Flat Deck to Dive Platform: Dive Barge Conversion for Navy’s Premier Aircraft Carrier

Transforming a flat deck barge into a fully mission-capable dive platform for one of the Navy’s most visible aircraft carriers.
Beyond the Training Event: Sustained Emergency Preparedness for Mining Operations Across the Americas

For more than two decades, PCCI has served as the embedded emergency management partner for one of the world’s largest global mining corporations